Subsequent to successful Part 21 audit program carried out in 2017, D.E Co. obtained Design Organization Approval (DOA) and Product Organization Approval (POA) certificates in civil aviation from IRI CAO.
Apart from meeting requirements of repair organization in repair design domain and the design analyses & knowledge obtained in this area, our Production Organization and Design Office make best use of such analyses to lead activities related to production of hot section and cold section engine components on existing turbine engines within its scope of work. So far, D.E Co. has successfully produced and operationalized a part of V2500 engine combustion chamber.
Aligned with the Company development scenario, our Design Office pursues increase in scope of work, production of critical components, implementation of minor change and obtaining STC to implement major changes in production and at the same time ensuring that flight safety and Part 21 safety requirements are carefully met.